Reference Customer

PLM changeover in a rapid tempo

28.04.2021
Huisman

Both the migration of the EPLAN workstations from Siemens Teamcenter to PTC Windchill as well as the integration of the EPLAN workstations in PTC Windchill was completed much faster than planned. The specification: The new interface should work as well as its predecessor and the PLM architecture needs to support the globally distributed sites in managing their compliance-compliant product versions that deviate from the standard.

more
Reference Customer

Redesign of the engineering processes controlled by Integrate2

17.03.2021
[Translate to english:]

Fill GmbH is a globally active machine builder for a wide variety of production processes, its electrical CAD solutions integrated in PRO.FILE. But new technologies require new workflows. On the occasion of the introduction of EPLAN, the engineering processes were redefined.

more
Reference Customer

Teamcenter integration of the Autodesk BIM solution Revit

17.03.2021
Meiko

MEIKO Maschinenbau GmbH & Co. KG supplies professional, precisely tailored rinsing and disinfection systems worldwide. The Revit file supplied by the customer includes the room and trade plans - the basis for the plant concept and installation. One project goal was the simplified data exchange of information of individual trades.

more
Reference Customer

Putzmeister updates mechanical product development

24.06.2019
Putzmeister

Putzmeister is a global supplier of machinery for construction sites and mining. Migration from PTC Creo and PTC WorkManager to Siemens NX and Teamcenter worldwide enables the company to create a transparent, end-to-end engineering process. The integration of SAP ERP makes it possible to transfer BOMs directly from Teamcenter. Legacy CAD data is available thanks to migration.

more
Reference Customer

Company-wide available data simplify engineering and approval processes

25.01.2019
BROOKS

Since directly integrating its CAD systems Autodesk Inventor and Altium Designer into Oracle Agile PLM, the development teams at Brooks have been working much more efficiently. Interdisciplinary coordination processes have been harmonised and the approval processes simplified. Thanks to migration, the PDM inventory data have been available in the new PLM system right from the start.

more
Reference Customer

Dynamic file-naming and FEA integration: only 2 of the requirements

01.11.2018
OSI

OSI Systems, supplier of electronic systems with very high compliance regulations, set special requirements for directly integrating SOLIDWORKS into Oracle Agile PLM. In the case of an updated CAD file, the file-naming should allow for corresponding values to be recorded. OSI Systems also wanted to store FEA analysis files in Agile when saving them.

more
Reference Customer

Single source of truth with logically linked development and component data

16.05.2018
Kiepe Electric

Kiepe Electric has significantly optimised its product development processes by directly integrating Aucotec ELCAD and Engineering Base into the PLM system PROCAD PRO.FILE. The traction supplier of electrically powered vehicles transfers the plans created with the Aucotec tools to PRO.FILE in a controlled manner. In doing so, this integration procedure generates the parts list in the defined format with guaranteed up-to-date components.

more